A- A A+ English Hindi
                       
Loading...
Report PE4-Cropped Detail Area

Report as on: 19/10/2025 01:47 AM

State: SIKKIM All area in ha.
S.No. District Total Project Area covered under diversified crops/ change in cropping system Area brought from Nil/Single crop to double or more crop No. of Water Harvesting Structure (WHS) constructed /rejuvenated Area Covered with soil and Moisture Area of degraded land covered /rainfed area developed
Nil to single crop Single to double or more crop
Project Area Controlled Area Project Area Controlled Area Project Area Controlled Area Project Area Controlled Area Project Area Controlled Area Project Area Controlled Area
1 Gangtok 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0 0 0.0000 0.0000 0.0000 0.0000
2 Gyalshing 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0 0 0.0000 0.0000 0.0000 0.0000
3 Mangan 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0 0 0.0000 0.0000 0.0000 0.0000
4 Namchi 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0 0 0.0000 0.0000 0.0000 0.0000
5 Pakyong 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0 0 0.0000 0.0000 0.0000 0.0000
6 Soreng 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0 0 0.0000 0.0000 0.0000 0.0000
Grand Total 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0 0 0.0000 0.0000 0.0000 0.0000