Report as on: 08/12/2025 07:17 PM
| S.No. | Project Name | Total Project Area Sanctioned | Total Project Area Covered for Baseline Survey | Total Area of Plots Covered for Baseline Survey | % of Total Area Covered for Plot-Wise Baseline Survey |
|---|---|---|---|---|---|
| 1 | 2 | 3 | 4 | 5 | 6 |
| 1 | ADILABAD-WDC - 1 /2021-22 | 4958 | 0.00 | 0.00 | 0.00% |
| 2 | ADILABAD-WDC - 2 /2021-22 | 4877 | 0.00 | 0.00 | 0.00% |
| 3 | ADILABAD-WDC - 5 /2021-22 | 1050 | 1050 | 900.00 | 86.00% |
| 4 | ADILABAD-WDC - 6 /2021-22 | 1100 | 0.00 | 0.00 | 0.00% |
| 5 | ADILABAD-WDC - 7 /2022-23 | 1250 | 0.00 | 0.00 | 0.00% |
| 6 | ADILABAD-WDC - 8 /2022-23 | 1280 | 1280 | 644.00 | 50.00% |
| Grand Total | 14515 | 2330.00 | 1544.00 | 11.00% | |