Report as on: 30/04/2025 10:57 AM
S.No. | Project Name | Total Project Area Sanctioned | Total Project Area Covered for Baseline Survey | Total Area of Plots Covered for Baseline Survey | % of Total Area Covered for Plot-Wise Baseline Survey |
---|---|---|---|---|---|
1 | 2 | 3 | 4 | 5 | 6 |
1 | NAWADA-WDC - 1 /2021-22 | 5224 | 0.00 | 0.00 | 0.00% |
2 | NAWADA-WDC - 2 /2021-22 | 5794 | 0.00 | 0.00 | 0.00% |
3 | NAWADA-WDC - 3 /2021-22 | 5881 | 0.00 | 0.00 | 0.00% |
Grand Total | 16899 | 0.00 | 0.00 | 0.00% |