1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
1 |
533623009384 |
|
BRNL00006838 |
NALANDA-WDC-I |
30/11/2023 |
BP-2023-24-17 |
|
|
0
|
40170.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
2 |
533623009384 |
|
BRNL00006838 |
NALANDA-WDC-I |
30/11/2023 |
BP-2023-24-17 |
|
|
0
|
780.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
3 |
530423007225 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
30/10/2023 |
BP-2023-24-9 |
|
|
0
|
32620.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
4 |
530423007225 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
30/10/2023 |
BP-2023-24-9 |
|
|
0
|
434700.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
5 |
521322002926 |
|
BRNL00006838 |
NALANDA-WDC-I |
30/07/2022 |
BP-2022-23-11 |
|
|
0
|
2850.00 |
0 |
|
6 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
30/01/2025 |
BP-2024-25-14 |
|
|
2923700
|
84960.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
7 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
30/01/2025 |
BP-2024-25-14 |
|
|
2923700
|
395040.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
8 |
503123016579 |
|
BRNL00006838 |
NALANDA-WDC-I |
30/01/2023 |
BP-2022-23-54 |
|
|
0
|
35105.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
9 |
503123016542 |
|
BRNL00006838 |
NALANDA-WDC-I |
30/01/2023 |
BP-2022-23-55 |
|
|
0
|
59545.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
10 |
|
|
BRNL00002686 |
WCDC Nalanda |
29/12/2023 |
BP-2023-24-7 |
|
|
0
|
14364.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
11 |
|
|
BRNL00002686 |
WCDC Nalanda |
29/12/2023 |
BP-2023-24-7 |
|
|
0
|
4095.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
12 |
|
|
BRNL00002686 |
WCDC Nalanda |
29/12/2023 |
BP-2023-24-7 |
|
|
0
|
21452.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
13 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
29/11/2024 |
BP-2024-25-18 |
|
|
0
|
8000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
14 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
29/11/2024 |
BP-2024-25-18 |
|
|
0
|
382.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
15 |
|
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
29/11/2024 |
BP-2024-25-7 |
|
|
2922000
|
102260.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
16 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
29/11/2024 |
BP-2024-25-18 |
|
|
0
|
21240.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
17 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
29/10/2024 |
BP-2024-25-17 |
|
|
0
|
37100.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
18 |
527223008571 |
|
BRNL00002686 |
WCDC Nalanda |
29/09/2023 |
BP-2023-24-1 |
|
|
0
|
117287.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
19 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
29/04/2024 |
BP-2024-25-1 |
|
|
0
|
65300.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
20 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
29/04/2024 |
BP-2024-25-2 |
|
|
0
|
224400.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
21 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
29/04/2024 |
BP-2024-25-2 |
|
|
0
|
66000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
22 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
29/04/2024 |
BP-2024-25-1 |
|
|
0
|
98900.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
23 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
29/04/2024 |
BP-2024-25-1 |
|
|
0
|
114800.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
24 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
28/12/2023 |
BP-2023-24-10 |
|
|
0
|
6898.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
25 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
28/12/2023 |
BP-2023-24-10 |
|
|
0
|
15700.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
26 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
28/12/2023 |
BP-2023-24-10 |
|
|
0
|
7900.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
27 |
518022006278 |
|
BRNL00006838 |
NALANDA-WDC-I |
28/06/2022 |
BP-2022-23-5 |
|
|
0
|
62790.00 |
0 |
|
28 |
518022006796 |
|
BRNL00006838 |
NALANDA-WDC-I |
28/06/2022 |
BP-2022-23-6 |
|
|
0
|
494900.00 |
0 |
|
29 |
518022006278 |
|
BRNL00006838 |
NALANDA-WDC-I |
28/06/2022 |
BP-2022-23-5 |
|
|
0
|
27200.00 |
0 |
|
30 |
518022006279 |
|
BRNL00006838 |
NALANDA-WDC-I |
28/06/2022 |
BP-2022-23-7 |
|
|
0
|
11400.00 |
0 |
|
31 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
27/11/2024 |
BP-2024-25-9 |
|
|
2923700
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
32 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
27/11/2024 |
BP-2024-25-9 |
|
|
2923700
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
33 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
27/11/2024 |
BP-2024-25-9 |
|
|
2923700
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
34 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
27/11/2024 |
BP-2024-25-9 |
|
|
2923700
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
35 |
|
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
27/11/2024 |
BP-2024-25-6 |
|
|
2922000
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
36 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
27/11/2024 |
BP-2024-25-9 |
|
|
2923700
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
37 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
27/11/2024 |
BP-2024-25-9 |
|
|
2923700
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
38 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
27/11/2024 |
BP-2024-25-6 |
|
|
0
|
50000.00 |
0 |
|
39 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
27/11/2024 |
BP-2024-25-6 |
|
|
0
|
50000.00 |
0 |
|
40 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
27/11/2024 |
BP-2024-25-6 |
|
|
0
|
50000.00 |
0 |
|
41 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
27/11/2024 |
BP-2024-25-6 |
|
|
0
|
50000.00 |
0 |
|
42 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
27/11/2024 |
BP-2024-25-6 |
|
|
0
|
50000.00 |
0 |
|
43 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
27/11/2024 |
BP-2024-25-6 |
|
|
0
|
50000.00 |
0 |
|
44 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
27/11/2024 |
BP-2024-25-6 |
|
|
0
|
50000.00 |
0 |
|
45 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
27/11/2024 |
BP-2024-25-6 |
|
|
0
|
50000.00 |
0 |
|
46 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
27/11/2024 |
BP-2024-25-6 |
|
|
0
|
50000.00 |
0 |
|
47 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
27/11/2024 |
BP-2024-25-6 |
|
|
0
|
50000.00 |
0 |
|
48 |
|
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
27/11/2024 |
BP-2024-25-8 |
|
|
2923000
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
49 |
|
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
27/11/2024 |
BP-2024-25-8 |
|
|
2923000
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
50 |
|
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
27/11/2024 |
BP-2024-25-8 |
|
|
2923000
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
51 |
|
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
27/11/2024 |
BP-2024-25-8 |
|
|
2923000
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
52 |
|
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
27/11/2024 |
BP-2024-25-8 |
|
|
2923000
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
53 |
|
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
27/11/2024 |
BP-2024-25-8 |
|
|
2923000
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
54 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
27/11/2024 |
BP-2024-25-9 |
|
|
2923700
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
55 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
27/11/2024 |
BP-2024-25-9 |
|
|
2923700
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
56 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
27/11/2024 |
BP-2024-25-6 |
|
|
0
|
50000.00 |
0 |
|
57 |
|
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
27/11/2024 |
BP-2024-25-6 |
|
|
2922000
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
58 |
|
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
27/11/2024 |
BP-2024-25-6 |
|
|
2922000
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
59 |
|
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
27/11/2024 |
BP-2024-25-6 |
|
|
2922000
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
60 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
27/11/2024 |
BP-2024-25-6 |
|
|
0
|
50000.00 |
0 |
|
61 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
27/11/2024 |
BP-2024-25-6 |
|
|
0
|
50000.00 |
0 |
|
62 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
27/11/2024 |
BP-2024-25-6 |
|
|
0
|
50000.00 |
0 |
|
63 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
27/11/2024 |
BP-2024-25-6 |
|
|
0
|
50000.00 |
0 |
|
64 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
27/11/2024 |
BP-2024-25-11 |
|
|
2921700
|
17320.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
65 |
|
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
27/11/2024 |
BP-2024-25-6 |
|
|
2922000
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
66 |
515223011465 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
27/05/2023 |
BP-2023-24-4 |
|
|
0
|
278400.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
67 |
515223011465 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
27/05/2023 |
BP-2023-24-4 |
|
|
0
|
231200.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
68 |
515223011464 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
27/05/2023 |
BP-2023-24-5 |
|
|
0
|
10000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
69 |
511923000636 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
27/04/2023 |
BP-2023-24-1 |
|
|
0
|
909200.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
70 |
511923000635 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
27/04/2023 |
BP-2023-24-1 |
|
|
0
|
7977.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
71 |
511923000635 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
27/04/2023 |
BP-2023-24-1 |
|
|
0
|
2382.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
72 |
511823003239 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
27/04/2023 |
BP-2023-24-2 |
|
|
0
|
7977.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
73 |
511823003239 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
27/04/2023 |
BP-2023-24-2 |
|
|
0
|
2834.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
74 |
511823003240 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
27/04/2023 |
BP-2023-24-3 |
|
|
0
|
104900.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
75 |
511923000628 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
27/04/2023 |
BP-2023-24-2 |
|
|
0
|
2441.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
76 |
511923000629 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
27/04/2023 |
BP-2023-24-2 |
|
|
0
|
223400.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
77 |
511923000628 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
27/04/2023 |
BP-2023-24-2 |
|
|
0
|
7316.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
78 |
|
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
27/01/2025 |
BP-2024-25-11 |
|
|
2923000
|
40000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
79 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
27/01/2025 |
BP-2024-25-13 |
|
|
2923700
|
40000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
80 |
503323006704 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
27/01/2023 |
BP-2022-23-1 |
|
|
0
|
27500.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
81 |
C012366962377 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
27/01/2023 |
BP-2022-23-2 |
|
|
0
|
744000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
82 |
503323006671 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
27/01/2023 |
BP-2022-23-3 |
|
|
0
|
40000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
83 |
500325009578 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
26/12/2024 |
BP-2024-25-8 |
|
|
2922000
|
49428.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
84 |
500325009579 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
26/12/2024 |
BP-2024-25-9 |
|
|
2922000
|
49920.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
85 |
533222005688 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/11/2022 |
BP-2022-23-44 |
|
|
0
|
156700.00 |
0 |
|
86 |
533222005688 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/11/2022 |
BP-2022-23-44 |
|
|
0
|
78900.00 |
0 |
|
87 |
533222005688 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/11/2022 |
BP-2022-23-44 |
|
|
0
|
6420.00 |
0 |
|
88 |
530423007392 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
26/10/2023 |
BP-2023-24-18 |
|
|
0
|
262600.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
89 |
527022007605 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/09/2022 |
BP-2022-23-27 |
|
|
0
|
22500.00 |
0 |
|
90 |
527022007554 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/09/2022 |
BP-2022-23-28 |
|
|
0
|
2772.00 |
0 |
|
91 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
26/06/2024 |
BP-2024-25-5 |
|
|
0
|
50000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
92 |
517823008734 |
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
26/06/2023 |
BP-2023-24-9 |
|
|
0
|
355400.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
93 |
|
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
26/04/2024 |
BP-2024-25-1 |
|
|
0
|
35000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
94 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
26/04/2024 |
BP-2024-25-1 |
|
|
0
|
32850.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
95 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
26/04/2024 |
BP-2024-25-1 |
|
|
0
|
35600.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
96 |
511723002574 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
26/04/2023 |
BP-2023-24-1 |
|
|
0
|
257000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
97 |
511723002574 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
26/04/2023 |
BP-2023-24-1 |
|
|
0
|
429900.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
98 |
511723002574 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
26/04/2023 |
BP-2023-24-1 |
|
|
0
|
368900.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
99 |
511723002574 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
26/04/2023 |
BP-2023-24-1 |
|
|
0
|
481900.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
100 |
511723002575 |
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
26/04/2023 |
BP-2023-24-1 |
|
|
0
|
118100.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
101 |
508623053092 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/03/2023 |
BP-2022-23-64 |
|
|
0
|
3800.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
102 |
508623053092 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/03/2023 |
BP-2022-23-64 |
|
|
0
|
2980.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
103 |
508623053092 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/03/2023 |
BP-2022-23-64 |
|
|
0
|
1270.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
104 |
508623053092 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/03/2023 |
BP-2022-23-64 |
|
|
0
|
380.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
105 |
508623053092 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/03/2023 |
BP-2022-23-64 |
|
|
0
|
2670.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
106 |
508623053092 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/03/2023 |
BP-2022-23-64 |
|
|
0
|
3530.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
107 |
508623053092 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/03/2023 |
BP-2022-23-64 |
|
|
0
|
5550.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
108 |
508623053092 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/03/2023 |
BP-2022-23-64 |
|
|
0
|
1200.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
109 |
508623053092 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/03/2023 |
BP-2022-23-64 |
|
|
0
|
1140.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
110 |
508623053092 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/03/2023 |
BP-2022-23-64 |
|
|
0
|
5360.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
111 |
508623053092 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/03/2023 |
BP-2022-23-64 |
|
|
0
|
6360.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
112 |
508623053092 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/03/2023 |
BP-2022-23-64 |
|
|
0
|
870.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
113 |
508623053092 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/03/2023 |
BP-2022-23-64 |
|
|
0
|
1990.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
114 |
508623053092 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/03/2023 |
BP-2022-23-64 |
|
|
0
|
4030.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
115 |
508623053092 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/03/2023 |
BP-2022-23-64 |
|
|
0
|
2310.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
116 |
508623053092 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/03/2023 |
BP-2022-23-64 |
|
|
0
|
2020.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
117 |
508623053092 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/03/2023 |
BP-2022-23-64 |
|
|
0
|
1620.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
118 |
508623053092 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/03/2023 |
BP-2022-23-64 |
|
|
0
|
4380.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
119 |
508623053092 |
|
BRNL00006838 |
NALANDA-WDC-I |
26/03/2023 |
BP-2022-23-64 |
|
|
0
|
1460.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
120 |
511624030805 |
|
BRNL00006838 |
NALANDA-WDC-I |
25/04/2024 |
BP-2024-25-2 |
|
|
0
|
8463.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
121 |
511624030804 |
|
BRNL00006838 |
NALANDA-WDC-I |
25/04/2024 |
BP-2024-25-1 |
|
|
0
|
2457.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
122 |
511624030804 |
|
BRNL00006838 |
NALANDA-WDC-I |
25/04/2024 |
BP-2024-25-1 |
|
|
0
|
120393.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
123 |
505823011265 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
25/02/2023 |
BP-2022-23-4 |
|
|
0
|
110900.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
124 |
505823010990 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
25/02/2023 |
BP-2022-23-5 |
|
|
0
|
347600.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
125 |
505823011265 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
25/02/2023 |
BP-2022-23-4 |
|
|
0
|
126700.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
126 |
536124011413 |
|
BRNL00002686 |
WCDC Nalanda |
24/12/2024 |
BP-2024-25-4 |
|
|
0
|
1000.00 |
0 |
|
127 |
536124011413 |
|
BRNL00002686 |
WCDC Nalanda |
24/12/2024 |
BP-2024-25-4 |
|
|
0
|
39522.00 |
0 |
|
128 |
536124011413 |
|
BRNL00002686 |
WCDC Nalanda |
24/12/2024 |
BP-2024-25-4 |
|
|
0
|
1000.00 |
0 |
|
129 |
536124011455 |
|
BRNL00002686 |
WCDC Nalanda |
24/12/2024 |
BP-2024-25-3 |
|
|
0
|
1000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
130 |
536124011455 |
|
BRNL00002686 |
WCDC Nalanda |
24/12/2024 |
BP-2024-25-3 |
|
|
0
|
39522.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
131 |
532922008872 |
|
BRNL00006838 |
NALANDA-WDC-I |
24/11/2022 |
BP-2022-23-40 |
|
|
0
|
10000.00 |
0 |
|
132 |
532922008819 |
|
BRNL00006838 |
NALANDA-WDC-I |
24/11/2022 |
BP-2022-23-41 |
|
|
0
|
1770.00 |
0 |
|
133 |
532922008871 |
|
BRNL00006838 |
NALANDA-WDC-I |
24/11/2022 |
BP-2022-23-42 |
|
|
0
|
7640.00 |
0 |
|
134 |
532922008875 |
|
BRNL00006838 |
NALANDA-WDC-I |
24/11/2022 |
BP-2022-23-43 |
|
|
0
|
87118.00 |
0 |
|
135 |
532922008872 |
|
BRNL00006838 |
NALANDA-WDC-I |
24/11/2022 |
BP-2022-23-40 |
|
|
0
|
21240.00 |
0 |
|
136 |
532922008872 |
|
BRNL00006838 |
NALANDA-WDC-I |
24/11/2022 |
BP-2022-23-40 |
|
|
0
|
1000.00 |
0 |
|
137 |
523622008253 |
|
BRNL00006838 |
NALANDA-WDC-I |
24/08/2022 |
BP-2022-23-17 |
|
|
0
|
5303.00 |
0 |
|
138 |
523622008164 |
|
BRNL00006838 |
NALANDA-WDC-I |
24/08/2022 |
BP-2022-23-16 |
|
|
0
|
69650.00 |
0 |
|
139 |
523622008164 |
|
BRNL00006838 |
NALANDA-WDC-I |
24/08/2022 |
BP-2022-23-16 |
|
|
0
|
12844.00 |
0 |
|
140 |
|
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
24/07/2023 |
BP-2023-24-10 |
|
|
0
|
333100.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
141 |
517823006432 |
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
24/06/2023 |
BP-2023-24-8 |
|
|
0
|
289000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
142 |
517823006432 |
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
24/06/2023 |
BP-2023-24-8 |
|
|
0
|
337500.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
143 |
514524008296 |
|
BRNL00006838 |
NALANDA-WDC-I |
24/05/2024 |
BP-2024-25-5 |
|
|
0
|
49500.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
144 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
24/02/2024 |
BP-2023-24-20 |
|
|
0
|
40000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
145 |
|
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
24/02/2024 |
BP-2023-24-9 |
|
|
0
|
531.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
146 |
|
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
24/02/2024 |
BP-2023-24-9 |
|
|
0
|
793.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
147 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
24/02/2024 |
BP-2023-24-19 |
|
|
0
|
5000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
148 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
24/01/2025 |
BP-2024-25-16 |
|
|
2921700
|
395520.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
149 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
24/01/2025 |
BP-2024-25-16 |
|
|
2921700
|
84480.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
150 |
533123002865 |
|
BRNL00002686 |
WCDC Nalanda |
23/11/2023 |
BP-2023-24-5 |
|
|
0
|
98720.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
151 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
23/10/2024 |
BP-2024-25-6 |
|
|
2923700
|
19230.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
152 |
|
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
23/10/2024 |
BP-2024-25-5 |
|
|
2922000
|
22090.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
153 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
23/10/2024 |
BP-2024-25-8 |
|
|
2921700
|
26380.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
154 |
517823006451 |
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
23/06/2023 |
BP-2023-24-7 |
|
|
0
|
32620.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
155 |
517823008702 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
23/06/2023 |
BP-2023-24-7 |
|
|
0
|
77600.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
156 |
517823006446 |
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
23/06/2023 |
BP-2023-24-6 |
|
|
0
|
77600.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
157 |
517823006451 |
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
23/06/2023 |
BP-2023-24-7 |
|
|
0
|
381200.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
158 |
517823008732 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
23/06/2023 |
BP-2023-24-9 |
|
|
0
|
77600.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
159 |
514423010437 |
|
BRNL00006838 |
NALANDA-WDC-I |
23/05/2023 |
BP-2023-24-3 |
|
|
0
|
7632.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
160 |
514423010437 |
|
BRNL00006838 |
NALANDA-WDC-I |
23/05/2023 |
BP-2023-24-3 |
|
|
0
|
7500.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
161 |
514423010438 |
|
BRNL00006838 |
NALANDA-WDC-I |
23/05/2023 |
BP-2023-24-2 |
|
|
0
|
23854.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
162 |
514423010438 |
|
BRNL00006838 |
NALANDA-WDC-I |
23/05/2023 |
BP-2023-24-2 |
|
|
0
|
420.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
163 |
514423010437 |
|
BRNL00006838 |
NALANDA-WDC-I |
23/05/2023 |
BP-2023-24-3 |
|
|
0
|
15822.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
164 |
514423010437 |
|
BRNL00006838 |
NALANDA-WDC-I |
23/05/2023 |
BP-2023-24-3 |
|
|
0
|
405.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
165 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
23/02/2024 |
BP-2023-24-15 |
|
|
0
|
31050.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
166 |
505523007273 |
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
23/02/2023 |
BP-2022-23-4 |
|
|
0
|
1131600.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
167 |
|
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
23/01/2025 |
BP-2024-25-11 |
|
|
2922000
|
84960.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
168 |
|
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
23/01/2025 |
BP-2024-25-10 |
|
|
2923000
|
29625.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
169 |
|
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
23/01/2025 |
BP-2024-25-10 |
|
|
2923000
|
426000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
170 |
|
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
23/01/2025 |
BP-2024-25-11 |
|
|
2922000
|
395040.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
171 |
514323006488 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
22/05/2023 |
BP-2023-24-3 |
|
|
0
|
292400.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
172 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
22/02/2024 |
BP-2023-24-13 |
|
|
0
|
396.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
173 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
22/02/2024 |
BP-2023-24-13 |
|
|
0
|
531.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
174 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
22/02/2024 |
BP-2023-24-12 |
|
|
0
|
69190.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
175 |
|
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
22/02/2024 |
BP-2023-24-11 |
|
|
0
|
45000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
176 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
21/11/2024 |
BP-2024-25-8 |
|
|
2923700
|
133717.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
177 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
21/11/2024 |
BP-2024-25-8 |
|
|
2923700
|
26935.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
178 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
21/07/2023 |
BP-2023-24-13 |
|
|
0
|
709900.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
179 |
517323011160 |
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
21/06/2023 |
BP-2023-24-5 |
|
|
0
|
448700.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
180 |
517322004406 |
|
BRNL00006838 |
NALANDA-WDC-I |
21/06/2022 |
BP-2022-23-2 |
|
|
0
|
5600.00 |
0 |
|
181 |
517322004407 |
|
BRNL00006838 |
NALANDA-WDC-I |
21/06/2022 |
BP-2022-23-3 |
|
|
0
|
1168912.00 |
0 |
|
182 |
517322004408 |
|
BRNL00006838 |
NALANDA-WDC-I |
21/06/2022 |
BP-2022-23-4 |
|
|
0
|
18438.00 |
0 |
|
183 |
517322004406 |
|
BRNL00006838 |
NALANDA-WDC-I |
21/06/2022 |
BP-2022-23-2 |
|
|
0
|
16800.00 |
0 |
|
184 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
20/11/2024 |
BP-2024-25-5 |
|
|
0
|
30520.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
185 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
20/10/2023 |
BP-2023-24-17 |
|
|
0
|
32620.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
186 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
20/10/2023 |
BP-2023-24-17 |
|
|
0
|
254700.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
187 |
526322007644 |
|
BRNL00006838 |
NALANDA-WDC-I |
20/09/2022 |
BP-2022-23-23 |
|
|
0
|
57120.00 |
0 |
|
188 |
526322007645 |
|
BRNL00006838 |
NALANDA-WDC-I |
20/09/2022 |
BP-2022-23-25 |
|
|
0
|
26963.00 |
0 |
|
189 |
526322007645 |
|
BRNL00006838 |
NALANDA-WDC-I |
20/09/2022 |
BP-2022-23-25 |
|
|
0
|
50100.00 |
0 |
|
190 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
20/02/2024 |
BP-2023-24-11 |
|
|
0
|
45000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
191 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
20/01/2025 |
BP-2024-25-8 |
|
|
0
|
99648.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
192 |
502323006785 |
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
20/01/2023 |
BP-2022-23-3 |
|
|
0
|
40000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
193 |
502323006786 |
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
20/01/2023 |
BP-2022-23-2 |
|
|
0
|
768000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
194 |
502323006731 |
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
20/01/2023 |
BP-2022-23-1 |
|
|
0
|
27500.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
195 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
19/11/2024 |
BP-2024-25-7 |
|
|
2923700
|
126704.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
196 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
19/11/2024 |
BP-2024-25-7 |
|
|
2923700
|
29208.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
197 |
529223016479 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
19/10/2023 |
BP-2023-24-8 |
|
|
0
|
328700.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
198 |
529322003668 |
|
BRNL00006838 |
NALANDA-WDC-I |
19/10/2022 |
BP-2022-23-31 |
|
|
0
|
145077.00 |
0 |
|
199 |
517323011156 |
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
19/06/2023 |
BP-2023-24-6 |
|
|
0
|
619600.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
200 |
511022003111 |
|
BRNL00006838 |
NALANDA-WDC-I |
19/04/2022 |
BP-2022-23-1 |
|
|
0
|
98639.00 |
0 |
|
201 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
19/02/2024 |
BP-2023-24-10 |
|
|
0
|
5000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
202 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
19/02/2024 |
BP-2023-24-11 |
|
|
0
|
40000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
203 |
523022004605 |
|
BRNL00006838 |
NALANDA-WDC-I |
18/08/2022 |
BP-2022-23-15 |
|
|
0
|
31500.00 |
0 |
|
204 |
523022004605 |
|
BRNL00006838 |
NALANDA-WDC-I |
18/08/2022 |
BP-2022-23-15 |
|
|
0
|
11784.00 |
0 |
|
205 |
523022004605 |
|
BRNL00006838 |
NALANDA-WDC-I |
18/08/2022 |
BP-2022-23-15 |
|
|
0
|
80000.00 |
0 |
|
206 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
18/07/2023 |
BP-2023-24-12 |
|
|
0
|
292100.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
207 |
508323025096 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
18/03/2023 |
BP-2022-23-5 |
|
|
0
|
15000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
208 |
|
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
18/01/2025 |
BP-2024-25-9 |
|
|
2923000
|
99648.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
209 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
18/01/2024 |
BP-2023-24-21 |
|
|
0
|
780.00 |
97 |
AURANGABAD-WDC - 1 /2021-22 |
210 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
18/01/2024 |
BP-2023-24-21 |
|
|
0
|
40170.00 |
97 |
AURANGABAD-WDC - 1 /2021-22 |
211 |
501823009431 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
18/01/2023 |
BP-2022-23-2 |
|
|
0
|
460000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
212 |
501823009430 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
18/01/2023 |
BP-2022-23-1 |
|
|
0
|
40000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
213 |
501923003992 |
|
BRNL00006838 |
NALANDA-WDC-I |
18/01/2023 |
BP-2022-23-52 |
|
|
0
|
24600.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
214 |
501923004017 |
|
BRNL00006838 |
NALANDA-WDC-I |
18/01/2023 |
BP-2022-23-53 |
|
|
0
|
6042.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
215 |
501923004016 |
|
BRNL00006838 |
NALANDA-WDC-I |
18/01/2023 |
BP-2022-23-51 |
|
|
0
|
34800.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
216 |
501923004017 |
|
BRNL00006838 |
NALANDA-WDC-I |
18/01/2023 |
BP-2022-23-53 |
|
|
0
|
2637.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
217 |
517323011027 |
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
17/06/2023 |
BP-2023-24-5 |
|
|
0
|
332100.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
218 |
517323011027 |
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
17/06/2023 |
BP-2023-24-5 |
|
|
0
|
764700.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
219 |
517323011027 |
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
17/06/2023 |
BP-2023-24-5 |
|
|
0
|
225200.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
220 |
517323011027 |
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
17/06/2023 |
BP-2023-24-5 |
|
|
0
|
207400.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
221 |
508323024528 |
|
BRNL00006838 |
NALANDA-WDC-I |
17/03/2023 |
BP-2022-23-63 |
|
|
0
|
1364.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
222 |
508323024528 |
|
BRNL00006838 |
NALANDA-WDC-I |
17/03/2023 |
BP-2022-23-63 |
|
|
0
|
79138.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
223 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
17/02/2025 |
BP-2024-25-16 |
|
|
2923700
|
5000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
224 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
17/01/2025 |
BP-2024-25-15 |
|
|
2921700
|
16334.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
225 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
17/01/2025 |
BP-2024-25-7 |
|
|
0
|
391680.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
226 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
17/01/2025 |
BP-2024-25-14 |
|
|
2921700
|
34000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
227 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
17/01/2025 |
BP-2024-25-15 |
|
|
2921700
|
1814.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
228 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
17/01/2025 |
BP-2024-25-12 |
|
|
2923700
|
49920.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
229 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
17/01/2025 |
BP-2024-25-10 |
|
|
2923700
|
49548.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
230 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
17/01/2025 |
BP-2024-25-7 |
|
|
0
|
88320.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
231 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
16/11/2024 |
BP-2024-25-10 |
|
|
2921700
|
15007.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
232 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
16/11/2024 |
BP-2024-25-9 |
|
|
2921700
|
884200.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
233 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
16/11/2024 |
BP-2024-25-10 |
|
|
2921700
|
801593.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
234 |
529023007263 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
16/10/2023 |
BP-2023-24-16 |
|
|
0
|
29084.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
235 |
529023002783 |
|
BRNL00002686 |
WCDC Nalanda |
16/10/2023 |
BP-2023-24-2 |
|
|
0
|
131435.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
236 |
529023007263 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
16/10/2023 |
BP-2023-24-16 |
|
|
0
|
241474.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
237 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
16/09/2023 |
BP-2023-24-15 |
|
|
0
|
217900.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
238 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
16/09/2023 |
BP-2023-24-15 |
|
|
0
|
29084.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
239 |
|
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
16/09/2023 |
BP-2023-24-7 |
|
|
0
|
21900.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
240 |
522922005371 |
|
BRNL00006838 |
NALANDA-WDC-I |
16/08/2022 |
BP-2022-23-14 |
|
|
0
|
84275.00 |
0 |
|
241 |
514324004977 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
16/05/2024 |
BP-2024-25-2 |
|
|
0
|
330100.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
242 |
514324004977 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
16/05/2024 |
BP-2024-25-2 |
|
|
0
|
15321.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
243 |
508023024428 |
|
BRNL00006838 |
NALANDA-WDC-I |
16/03/2023 |
BP-2022-23-62 |
|
|
0
|
1000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
244 |
508023024428 |
|
BRNL00006838 |
NALANDA-WDC-I |
16/03/2023 |
BP-2022-23-62 |
|
|
0
|
5000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
245 |
508323024430 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
16/03/2023 |
BP-2022-23-3 |
|
|
0
|
22500.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
246 |
508023024428 |
|
BRNL00006838 |
NALANDA-WDC-I |
16/03/2023 |
BP-2022-23-62 |
|
|
0
|
2000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
247 |
508023012782 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
16/03/2023 |
BP-2022-23-6 |
|
|
0
|
15000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
248 |
502023013847 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
16/01/2023 |
BP-2022-23-3 |
|
|
0
|
530000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
249 |
501723011696 |
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
16/01/2023 |
BP-2022-23-2 |
|
|
0
|
40000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
250 |
502023013850 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
16/01/2023 |
BP-2022-23-2 |
|
|
0
|
40000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
251 |
501723011695 |
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
16/01/2023 |
BP-2022-23-1 |
|
|
0
|
27500.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
252 |
502023013848 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
16/01/2023 |
BP-2022-23-1 |
|
|
0
|
27500.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
253 |
501723011732 |
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
16/01/2023 |
BP-2022-23-3 |
|
|
0
|
510000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
254 |
535022009541 |
|
BRNL00006838 |
NALANDA-WDC-I |
15/12/2022 |
BP-2022-23-47 |
|
|
0
|
43955.00 |
0 |
|
255 |
529022004865 |
|
BRNL00006838 |
NALANDA-WDC-I |
15/10/2022 |
BP-2022-23-30 |
|
|
0
|
1188.00 |
0 |
|
256 |
529022004865 |
|
BRNL00006838 |
NALANDA-WDC-I |
15/10/2022 |
BP-2022-23-30 |
|
|
0
|
24780.00 |
0 |
|
257 |
517123005014 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
15/06/2023 |
BP-2023-24-8 |
|
|
0
|
219400.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
258 |
516723012492 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
15/06/2023 |
BP-2023-24-6 |
|
|
0
|
149200.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
259 |
516723012492 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
15/06/2023 |
BP-2023-24-6 |
|
|
0
|
333600.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
260 |
517123005014 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
15/06/2023 |
BP-2023-24-8 |
|
|
0
|
652800.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
261 |
517123005014 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
15/06/2023 |
BP-2023-24-8 |
|
|
0
|
173600.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
262 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
15/05/2024 |
BP-2024-25-2 |
|
|
0
|
341032.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
263 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
15/05/2024 |
BP-2024-25-2 |
|
|
0
|
11262.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
264 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
15/05/2024 |
BP-2024-25-2 |
|
|
0
|
412200.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
265 |
|
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
15/05/2024 |
BP-2024-25-4 |
|
|
0
|
13848.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
266 |
|
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
15/05/2024 |
BP-2024-25-4 |
|
|
0
|
313277.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
267 |
513623010936 |
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
15/05/2023 |
BP-2023-24-3 |
|
|
0
|
417500.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
268 |
513623010936 |
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
15/05/2023 |
BP-2023-24-3 |
|
|
0
|
10000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
269 |
513623009869 |
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
15/05/2023 |
BP-2023-24-1 |
|
|
0
|
425800.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
270 |
513623009870 |
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
15/05/2023 |
BP-2023-24-2 |
|
|
0
|
10000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
271 |
507824032138 |
|
BRNL00006838 |
NALANDA-WDC-I |
15/03/2024 |
BP-2023-24-22 |
|
|
0
|
8866.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
272 |
507723024997 |
|
BRNL00006838 |
NALANDA-WDC-I |
15/03/2023 |
BP-2022-23-61 |
|
|
0
|
4700.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
273 |
535023010741 |
|
BRNL00002686 |
WCDC Nalanda |
14/12/2023 |
BP-2023-24-6 |
|
|
0
|
3601.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
274 |
535023010741 |
|
BRNL00002686 |
WCDC Nalanda |
14/12/2023 |
BP-2023-24-6 |
|
|
0
|
18950.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
275 |
532023002774 |
|
BRNL00006838 |
NALANDA-WDC-I |
14/11/2023 |
BP-2023-24-16 |
|
|
0
|
4500.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
276 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
14/07/2023 |
BP-2023-24-7 |
|
|
0
|
77600.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
277 |
|
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
14/07/2023 |
BP-2023-24-6 |
|
|
0
|
77600.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
278 |
516623014433 |
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
14/06/2023 |
BP-2023-24-4 |
|
|
0
|
441400.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
279 |
516623014676 |
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
14/06/2023 |
BP-2023-24-4 |
|
|
0
|
154700.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
280 |
507523020155 |
|
BRNL00006838 |
NALANDA-WDC-I |
14/03/2023 |
BP-2022-23-60 |
|
|
0
|
40170.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
281 |
507523020155 |
|
BRNL00006838 |
NALANDA-WDC-I |
14/03/2023 |
BP-2022-23-60 |
|
|
0
|
780.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
282 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
13/06/2024 |
BP-2024-25-4 |
|
|
0
|
50000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
283 |
|
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
13/06/2024 |
BP-2024-25-3 |
|
|
0
|
50000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
284 |
516723012485 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
13/06/2023 |
BP-2023-24-5 |
|
|
0
|
342000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
285 |
513424003490 |
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
13/05/2024 |
BP-2024-25-3 |
|
|
0
|
15000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
286 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
13/05/2024 |
BP-2024-25-3 |
|
|
0
|
15000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
287 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
13/05/2024 |
BP-2024-25-3 |
|
|
0
|
15000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
288 |
507323021056 |
|
BRNL00006838 |
NALANDA-WDC-I |
13/03/2023 |
BP-2022-23-59 |
|
|
0
|
49500.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
289 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
13/02/2025 |
BP-2024-25-15 |
|
|
2923700
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
290 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
13/02/2025 |
BP-2024-25-15 |
|
|
2923700
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
291 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
13/02/2025 |
BP-2024-25-15 |
|
|
2923700
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
292 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
13/02/2025 |
BP-2024-25-15 |
|
|
2923700
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
293 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
13/02/2025 |
BP-2024-25-15 |
|
|
2923700
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
294 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
13/02/2025 |
BP-2024-25-15 |
|
|
2923700
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
295 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
13/02/2025 |
BP-2024-25-15 |
|
|
2923700
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
296 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
13/02/2025 |
BP-2024-25-15 |
|
|
2923700
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
297 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
13/02/2025 |
BP-2024-25-15 |
|
|
2923700
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
298 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
13/02/2025 |
BP-2024-25-15 |
|
|
2923700
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
299 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
13/02/2025 |
BP-2024-25-15 |
|
|
2923700
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
300 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
13/02/2025 |
BP-2024-25-15 |
|
|
2923700
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
301 |
534723013337 |
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
12/12/2023 |
BP-2023-24-9 |
|
|
0
|
399700.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
302 |
519422009633 |
|
BRNL00006838 |
NALANDA-WDC-I |
12/07/2022 |
BP-2022-23-10 |
|
|
0
|
220500.00 |
0 |
|
303 |
516623014496 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
12/06/2023 |
BP-2023-24-4 |
|
|
0
|
991300.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
304 |
516623014496 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
12/06/2023 |
BP-2023-24-4 |
|
|
0
|
442900.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
305 |
516623014496 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
12/06/2023 |
BP-2023-24-4 |
|
|
0
|
290700.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
306 |
501323013739 |
|
BRNL00006838 |
NALANDA-WDC-I |
12/01/2023 |
BP-2022-23-50 |
|
|
0
|
150300.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
307 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
11/06/2024 |
BP-2024-25-4 |
|
|
0
|
94100.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
308 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
11/06/2024 |
BP-2024-25-4 |
|
|
0
|
82600.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
309 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
11/06/2024 |
BP-2024-25-4 |
|
|
0
|
81926.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
310 |
|
|
BRNL00002686 |
WCDC Nalanda |
11/06/2024 |
BP-2024-25-1 |
|
|
0
|
49736.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
311 |
507224015651 |
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
11/03/2024 |
BP-2023-24-12 |
|
|
0
|
168800.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
312 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
11/02/2025 |
BP-2024-25-19 |
|
|
0
|
3906.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
313 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
11/01/2025 |
BP-2024-25-13 |
|
|
2921700
|
49920.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
314 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
11/01/2025 |
BP-2024-25-12 |
|
|
2921700
|
49438.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
315 |
525424006216 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
10/09/2024 |
BP-2024-25-6 |
|
|
0
|
12016.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
316 |
525424006216 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
10/09/2024 |
BP-2024-25-6 |
|
|
0
|
693584.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
317 |
513123013096 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
10/05/2023 |
BP-2023-24-3 |
|
|
0
|
261500.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
318 |
513123013097 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
10/05/2023 |
BP-2023-24-5 |
|
|
0
|
10000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
319 |
513123013072 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
10/05/2023 |
BP-2023-24-4 |
|
|
0
|
361800.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
320 |
513123013072 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
10/05/2023 |
BP-2023-24-4 |
|
|
0
|
296800.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
321 |
501123008377 |
|
BRNL00006838 |
NALANDA-WDC-I |
10/01/2023 |
BP-2022-23-49 |
|
|
0
|
8250.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
322 |
501123008398 |
|
BRNL00006838 |
NALANDA-WDC-I |
10/01/2023 |
BP-2022-23-48 |
|
|
0
|
149800.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
323 |
501123008398 |
|
BRNL00006838 |
NALANDA-WDC-I |
10/01/2023 |
BP-2022-23-48 |
|
|
0
|
141400.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
324 |
|
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
09/09/2024 |
BP-2024-25-5 |
|
|
0
|
657200.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
325 |
525423005228 |
|
BRNL00006838 |
NALANDA-WDC-I |
09/09/2023 |
BP-2023-24-12 |
|
|
0
|
8910.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
326 |
|
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
09/07/2024 |
BP-2024-25-5 |
|
|
0
|
90700.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
327 |
516523013762 |
|
BRNL00006838 |
NALANDA-WDC-I |
09/06/2023 |
BP-2023-24-7 |
|
|
0
|
1500.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
328 |
516523013761 |
|
BRNL00006838 |
NALANDA-WDC-I |
09/06/2023 |
BP-2023-24-8 |
|
|
0
|
1586.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
329 |
516523013762 |
|
BRNL00006838 |
NALANDA-WDC-I |
09/06/2023 |
BP-2023-24-7 |
|
|
0
|
2666.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
330 |
531222005769 |
|
BRNL00006838 |
NALANDA-WDC-I |
08/11/2022 |
BP-2022-23-39 |
|
|
0
|
17490.00 |
0 |
|
331 |
531222005769 |
|
BRNL00006838 |
NALANDA-WDC-I |
08/11/2022 |
BP-2022-23-39 |
|
|
0
|
28084.00 |
0 |
|
332 |
528422005774 |
|
BRNL00006838 |
NALANDA-WDC-I |
08/10/2022 |
BP-2022-23-29 |
|
|
0
|
8580.00 |
0 |
|
333 |
519323015283 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
08/07/2023 |
BP-2023-24-11 |
|
|
0
|
1027000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
334 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
08/06/2024 |
BP-2024-25-6 |
|
|
0
|
9269.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
335 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
08/06/2024 |
BP-2024-25-7 |
|
|
0
|
40170.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
336 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
08/06/2024 |
BP-2024-25-7 |
|
|
0
|
780.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
337 |
|
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
08/05/2024 |
BP-2024-25-2 |
|
|
0
|
50000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
338 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
08/05/2024 |
BP-2024-25-4 |
|
|
0
|
40170.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
339 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
08/05/2024 |
BP-2024-25-4 |
|
|
0
|
780.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
340 |
|
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
08/05/2024 |
BP-2024-25-1 |
|
|
0
|
261900.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
341 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
08/05/2024 |
BP-2024-25-3 |
|
|
0
|
8866.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
342 |
|
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
08/05/2024 |
BP-2024-25-1 |
|
|
0
|
22327.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
343 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
07/10/2023 |
BP-2023-24-14 |
|
|
0
|
40170.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
344 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
07/10/2023 |
BP-2023-24-14 |
|
|
0
|
780.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
345 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
07/10/2023 |
BP-2023-24-13 |
|
|
0
|
8866.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
346 |
515923015490 |
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
07/06/2023 |
BP-2023-24-3 |
|
|
0
|
215700.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
347 |
534023007431 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/12/2023 |
BP-2023-24-19 |
|
|
0
|
8060.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
348 |
531123002052 |
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
06/11/2023 |
BP-2023-24-8 |
|
|
0
|
700800.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
349 |
525122010994 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/09/2022 |
BP-2022-23-22 |
|
|
0
|
30590.00 |
0 |
|
350 |
525122010993 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/09/2022 |
BP-2022-23-21 |
|
|
0
|
75858.00 |
0 |
|
351 |
|
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
06/08/2024 |
BP-2024-25-3 |
|
|
0
|
50000.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
352 |
515823013588 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
06/06/2023 |
BP-2023-24-7 |
|
|
0
|
330000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
353 |
515823013588 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
06/06/2023 |
BP-2023-24-7 |
|
|
0
|
29084.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
354 |
515923015485 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/06/2023 |
BP-2023-24-6 |
|
|
0
|
118400.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
355 |
515923015485 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/06/2023 |
BP-2023-24-6 |
|
|
0
|
6420.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
356 |
512923006401 |
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
06/05/2023 |
BP-2023-24-2 |
|
|
0
|
7977.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
357 |
512923006401 |
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
06/05/2023 |
BP-2023-24-2 |
|
|
0
|
2222.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
358 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2025 |
BP-2024-25-21 |
|
|
0
|
2472.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
359 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2025 |
BP-2024-25-21 |
|
|
0
|
9140.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
360 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2025 |
BP-2024-25-21 |
|
|
0
|
7485.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
361 |
507223008625 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-58 |
|
|
0
|
2220.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
362 |
507223008625 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-58 |
|
|
0
|
1040.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
363 |
507223008625 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-58 |
|
|
0
|
790.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
364 |
507223008625 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-58 |
|
|
0
|
670.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
365 |
507223008625 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-58 |
|
|
0
|
1140.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
366 |
506523016877 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-57 |
|
|
0
|
7590.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
367 |
507223008625 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-58 |
|
|
0
|
830.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
368 |
507223008625 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-58 |
|
|
0
|
760.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
369 |
507223008625 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-58 |
|
|
0
|
1650.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
370 |
507223008625 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-58 |
|
|
0
|
2010.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
371 |
507223008625 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-58 |
|
|
0
|
2700.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
372 |
507223008625 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-58 |
|
|
0
|
4480.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
373 |
507223008625 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-58 |
|
|
0
|
3460.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
374 |
507223008625 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-58 |
|
|
0
|
570.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
375 |
507223008625 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-58 |
|
|
0
|
450.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
376 |
507223008625 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-58 |
|
|
0
|
330.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
377 |
507223008625 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-58 |
|
|
0
|
250.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
378 |
507223008625 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-58 |
|
|
0
|
2020.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
379 |
507223008625 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-58 |
|
|
0
|
1830.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
380 |
507223008625 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-58 |
|
|
0
|
1030.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
381 |
507223008625 |
|
BRNL00006838 |
NALANDA-WDC-I |
06/03/2023 |
BP-2022-23-58 |
|
|
0
|
1470.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
382 |
533922007496 |
|
BRNL00006838 |
NALANDA-WDC-I |
05/12/2022 |
BP-2022-23-46 |
|
|
0
|
146928.00 |
0 |
|
383 |
524822005539 |
|
BRNL00006838 |
NALANDA-WDC-I |
05/09/2022 |
BP-2022-23-20 |
|
|
0
|
48744.00 |
0 |
|
384 |
524822005538 |
|
BRNL00006838 |
NALANDA-WDC-I |
05/09/2022 |
BP-2022-23-19 |
|
|
0
|
18199.00 |
0 |
|
385 |
524822005537 |
|
BRNL00006838 |
NALANDA-WDC-I |
05/09/2022 |
BP-2022-23-18 |
|
|
0
|
7920.00 |
0 |
|
386 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
05/08/2023 |
BP-2023-24-11 |
|
|
0
|
4270.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
387 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
05/08/2023 |
BP-2023-24-11 |
|
|
0
|
13890.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
388 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
05/08/2023 |
BP-2023-24-11 |
|
|
0
|
1850.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
389 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
05/08/2023 |
BP-2023-24-10 |
|
|
0
|
1560.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
390 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
05/08/2023 |
BP-2023-24-11 |
|
|
0
|
5720.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
391 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
05/08/2023 |
BP-2023-24-9 |
|
|
0
|
12870.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
392 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
05/08/2023 |
BP-2023-24-10 |
|
|
0
|
80340.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
393 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
05/07/2024 |
BP-2024-25-10 |
|
|
0
|
40170.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
394 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
05/07/2024 |
BP-2024-25-8 |
|
|
0
|
8866.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
395 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
05/07/2024 |
BP-2024-25-9 |
|
|
0
|
42000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
396 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
05/07/2024 |
BP-2024-25-10 |
|
|
0
|
780.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
397 |
518823006235 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
05/07/2023 |
BP-2023-24-8 |
|
|
0
|
195600.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
398 |
518823006235 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
05/07/2023 |
BP-2023-24-8 |
|
|
0
|
424700.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
399 |
515823013582 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
05/06/2023 |
BP-2023-24-6 |
|
|
0
|
340200.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
400 |
515823013582 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
05/06/2023 |
BP-2023-24-6 |
|
|
0
|
299700.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
401 |
515823013582 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
05/06/2023 |
BP-2023-24-6 |
|
|
0
|
199600.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
402 |
530823007797 |
|
BRNL00006838 |
NALANDA-WDC-I |
04/11/2023 |
BP-2023-24-15 |
|
|
0
|
8463.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
403 |
530922006808 |
|
BRNL00006838 |
NALANDA-WDC-I |
04/11/2022 |
BP-2022-23-36 |
|
|
0
|
1770.00 |
0 |
|
404 |
530922006859 |
|
BRNL00006838 |
NALANDA-WDC-I |
04/11/2022 |
BP-2022-23-38 |
|
|
0
|
22050.00 |
0 |
|
405 |
530922006858 |
|
BRNL00006838 |
NALANDA-WDC-I |
04/11/2022 |
BP-2022-23-37 |
|
|
0
|
8850.00 |
0 |
|
406 |
518624007637 |
|
BRNL00002686 |
WCDC Nalanda |
04/07/2024 |
BP-2024-25-2 |
|
|
0
|
109000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
407 |
506524003656 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
04/03/2024 |
BP-2023-24-11 |
|
|
0
|
139981.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
408 |
506524004480 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
04/03/2024 |
BP-2023-24-12 |
|
|
0
|
200340.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
409 |
506524003656 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
04/03/2024 |
BP-2023-24-11 |
|
|
0
|
574.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
410 |
506524003657 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
04/03/2024 |
BP-2023-24-10 |
|
|
0
|
101980.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
411 |
506524003657 |
|
BRNL00006969 |
NALANDA-WDC-1/2021-22 GHOSTAWAN WC |
04/03/2024 |
BP-2023-24-10 |
|
|
0
|
864.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
412 |
506523025474 |
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
04/03/2023 |
BP-2022-23-5 |
|
|
0
|
15000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
413 |
507223009749 |
|
BRNL00006972 |
NALANDA-WDC-1/2021-22 NANAND WC |
04/03/2023 |
BP-2022-23-4 |
|
|
0
|
15000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
414 |
500424013289 |
|
BRNL00006838 |
NALANDA-WDC-I |
04/01/2024 |
BP-2023-24-20 |
|
|
0
|
8866.00 |
97 |
AURANGABAD-WDC - 1 /2021-22 |
415 |
533922007507 |
|
BRNL00006838 |
NALANDA-WDC-I |
03/12/2022 |
BP-2022-23-45 |
|
|
0
|
8580.00 |
0 |
|
416 |
531323010741 |
|
BRNL00002686 |
WCDC Nalanda |
03/11/2023 |
BP-2023-24-3 |
|
|
0
|
12360.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
417 |
531223012620 |
|
BRNL00002686 |
WCDC Nalanda |
03/11/2023 |
BP-2023-24-4 |
|
|
0
|
7740.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
418 |
515423006704 |
|
BRNL00006838 |
NALANDA-WDC-I |
03/06/2023 |
BP-2023-24-4 |
|
|
0
|
8250.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
419 |
515423006851 |
|
BRNL00006838 |
NALANDA-WDC-I |
03/06/2023 |
BP-2023-24-5 |
|
|
0
|
40170.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
420 |
515423006851 |
|
BRNL00006838 |
NALANDA-WDC-I |
03/06/2023 |
BP-2023-24-5 |
|
|
0
|
780.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
421 |
503523007886 |
|
BRNL00006838 |
NALANDA-WDC-I |
03/02/2023 |
BP-2022-23-56 |
|
|
0
|
8250.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
422 |
530722004436 |
|
BRNL00006838 |
NALANDA-WDC-I |
02/11/2022 |
BP-2022-23-34 |
|
|
0
|
73200.00 |
0 |
|
423 |
530722004436 |
|
BRNL00006838 |
NALANDA-WDC-I |
02/11/2022 |
BP-2022-23-34 |
|
|
0
|
83200.00 |
0 |
|
424 |
530722004436 |
|
BRNL00006838 |
NALANDA-WDC-I |
02/11/2022 |
BP-2022-23-34 |
|
|
0
|
82900.00 |
0 |
|
425 |
530722004436 |
|
BRNL00006838 |
NALANDA-WDC-I |
02/11/2022 |
BP-2022-23-34 |
|
|
0
|
35887.00 |
0 |
|
426 |
530722004436 |
|
BRNL00006838 |
NALANDA-WDC-I |
02/11/2022 |
BP-2022-23-34 |
|
|
0
|
157600.00 |
0 |
|
427 |
530722004436 |
|
BRNL00006838 |
NALANDA-WDC-I |
02/11/2022 |
BP-2022-23-34 |
|
|
0
|
158100.00 |
0 |
|
428 |
530722004436 |
|
BRNL00006838 |
NALANDA-WDC-I |
02/11/2022 |
BP-2022-23-34 |
|
|
0
|
157500.00 |
0 |
|
429 |
530722004436 |
|
BRNL00006838 |
NALANDA-WDC-I |
02/11/2022 |
BP-2022-23-34 |
|
|
0
|
157700.00 |
0 |
|
430 |
530722004436 |
|
BRNL00006838 |
NALANDA-WDC-I |
02/11/2022 |
BP-2022-23-34 |
|
|
0
|
157900.00 |
0 |
|
431 |
530722004436 |
|
BRNL00006838 |
NALANDA-WDC-I |
02/11/2022 |
BP-2022-23-34 |
|
|
0
|
59900.00 |
0 |
|
432 |
530722004470 |
|
BRNL00006838 |
NALANDA-WDC-I |
02/11/2022 |
BP-2022-23-35 |
|
|
0
|
6600.00 |
0 |
|
433 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
02/08/2023 |
BP-2023-24-14 |
|
|
0
|
196700.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
434 |
512424005020 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
02/05/2024 |
BP-2024-25-2 |
|
|
0
|
196200.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
435 |
512424005020 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
02/05/2024 |
BP-2024-25-2 |
|
|
0
|
68300.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
436 |
512424005020 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
02/05/2024 |
BP-2024-25-2 |
|
|
0
|
130806.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
437 |
512424005020 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
02/05/2024 |
BP-2024-25-2 |
|
|
0
|
72900.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
438 |
512424005020 |
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
02/05/2024 |
BP-2024-25-2 |
|
|
0
|
105919.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
439 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
02/05/2023 |
BP-2023-24-1 |
|
|
0
|
13530.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
440 |
530722004431 |
|
BRNL00006838 |
NALANDA-WDC-I |
01/11/2022 |
BP-2022-23-32 |
|
|
0
|
1000.00 |
0 |
|
441 |
530722004431 |
|
BRNL00006838 |
NALANDA-WDC-I |
01/11/2022 |
BP-2022-23-32 |
|
|
0
|
2000.00 |
0 |
|
442 |
530722004432 |
|
BRNL00006838 |
NALANDA-WDC-I |
01/11/2022 |
BP-2022-23-33 |
|
|
0
|
96120.00 |
0 |
|
443 |
521422003899 |
|
BRNL00006838 |
NALANDA-WDC-I |
01/08/2022 |
BP-2022-23-12 |
|
|
0
|
30000.00 |
0 |
|
444 |
521422003899 |
|
BRNL00006838 |
NALANDA-WDC-I |
01/08/2022 |
BP-2022-23-12 |
|
|
0
|
40000.00 |
0 |
|
445 |
|
|
BRNL00006971 |
NALANDA-WDC-1/2021-22 BRAKAR WC |
01/07/2023 |
BP-2023-24-10 |
|
|
0
|
144500.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
446 |
518322002790 |
|
BRNL00006838 |
NALANDA-WDC-I |
01/07/2022 |
BP-2022-23-9 |
|
|
0
|
5950.00 |
0 |
|
447 |
518322002790 |
|
BRNL00006838 |
NALANDA-WDC-I |
01/07/2022 |
BP-2022-23-9 |
|
|
0
|
15435.00 |
0 |
|
448 |
518322002790 |
|
BRNL00006838 |
NALANDA-WDC-I |
01/07/2022 |
BP-2022-23-9 |
|
|
0
|
27657.00 |
0 |
|
449 |
518222007122 |
|
BRNL00006838 |
NALANDA-WDC-I |
01/07/2022 |
BP-2022-23-8 |
|
|
0
|
33800.00 |
0 |
|
450 |
|
|
BRNL00006838 |
NALANDA-WDC-I |
01/03/2025 |
BP-2024-25-20 |
|
|
0
|
36353.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
451 |
506123015888 |
|
BRNL00006974 |
NALANDA-WDC-1/2021-22 MAHURI WC |
01/03/2023 |
BP-2022-23-4 |
|
|
0
|
744000.00 |
120 |
ARWAL-WDC - 1 /2021-22 |
452 |
|
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
01/02/2025 |
BP-2024-25-13 |
|
|
2923000
|
395520.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
453 |
|
|
BRNL00006973 |
NALANDA-WDC-1/2021-22 PAWADIH WC |
01/02/2025 |
BP-2024-25-13 |
|
|
2923000
|
84480.00 |
122 |
NALANDA-WDC - 1 /2021-22 |
Grand Total |
49215868.00 |
|